RSS

Category Archives: project

Featured Project: AdRoll

A few years ago, we worked on a commercial project South of Market in San Francisco. Final photos of the workspace:

 
Leave a comment

Posted by on April 24, 2015 in jobsite, project

 

Tags: , ,

Featured Project : Sunset / SF

Our Outer Sunset project has come to an end. The work is complete and here are some photos of the finished product.

 
Leave a comment

Posted by on April 24, 2015 in Featured Projects, jobsite, photos, project

 

Tags: , ,

Sunset / SF: Floors

Fume (16)

Finishes Begin

Lots of sanding.  Lots of dust.  Lots of work preparing surfaces for finishes.  There is a coat of primer on the walls.  This is a critical step because it serves as the hand-off from the drywallers to the painters.  Once the primer hits the wall, any rough areas can be seen and addressed.  The floors have been patched and sanded.  We have decided to use a new flooring finish on this house.  We’ve been hearing good things about the product and it scores green points by being a noVOC product.  We’re using Rubio Monocoat in the color charcoal.  The color that you see in the photo is from the fumed coat.  This treatment adds a greying effect to the wood, which we thinks ties in well with our contemporary finishes.  The floors will be stunning!

Tomorrow the color coat goes down on our hardwood.  Meanwhile, the finished concrete floors downstairs will receive a sealer.  We will let the floors take a siesta over the weekend and then begin trim in earnest next week.  Cabinets will be installed.  Tile details will be applied.  Countertops will be templated.  Color will hit the walls.  The finish line is coming into focus.

 

Tags: , , , , , , , , ,

Sunset / SF: Sheetrock

Sheetrock (5)

Bringing It Back Together

All of our rough inspections are complete!  Design evolved along the way.  Details were added.  The house starts to take on some personality.  As with any project, there is some give and some take.  There is always the unexpected turn or two.  But the landmark of completing all rough inspections is behind us, and we have covered the walls with sheetrock.  This is the stage when rooms take on their definition and you can start to feel the flow of the house.  We will wrap up sanding the drywall this week and will then prime the entire house.

Next week we will be moving into our flooring upstairs.  We began floating the bathrooms this week and will begin setting tile in the next couple of days.  The roof has been replaced, as well as some new skylights.  We insulated the entire house before the sheetrock went up; this will ensure that our radiant heating system is at top efficiency.  In a couple of weeks our finish work will kick in to high gear.  April will see this house come to market!

 
Leave a comment

Posted by on March 7, 2013 in jobsite, photos, project, Remodel

 

Tags:

Sunset / SF: Starting Over

Kitchen Frame

This is our project out in the Sunset District.  The house was in rough shape and needed some real love.  The downstairs was an unfinished basement and will be converted into a master suite with an office.  There will also be a laundry room and a mudroom upon entry.  A one-car garage will remain.  The upstairs will go through a minor transformation.  The majority of the house was covered in the cork panels that you see on the right.  The kitchen was closed off, the bathroom outdated and the bedroom closets were “unique.”  We have stripped the floor back and will put in a gourmet kitchen.  What was once a wall will now be a peninsula to open up the space between the kitchen and living room.  The hallway wall was pulled back to open up the space more, but to retain privacy for the bath entry.  This photo captures work at the middle of framing.  As the job progresses we’ll check in from this same perspective to watch the change.  Stay tuned.

 
1 Comment

Posted by on January 15, 2013 in Framing, jobsite, Kitchen, photos, project, Remodel

 

Tags: , , , , , , , , , ,

Café Underground Plumbing

Work is well underway for all of the new underground plumbing at our café project.  Two independent systems will pick up multiple sinks.  All of the food prep sinks will head out through a grease interceptor.  All other sinks will head out through a standard sewer connection.  Much of the equipment will be drained into a floor sink to provide an air gap.

The underground leaves the kitchen and pitches down to the basement area.  It punches through an old brick foundation and then ties in to the existing sewer system.  The grease interceptor will sit in this room, which will allow cleaning from the sidewalk pop up doors.

A couple of floor drains will tie into the system.  Each of these will receive a trap primer to maintain a vapor lock.  When our final connections are complete, we will have the plumbing department out to sign off on the work.  We will then backfill and compact and pour our concrete.  Eventually the floor will receive an epoxy finish.  Once the slab is down we can begin our metal framing.

 
Leave a comment

Posted by on June 12, 2012 in jobsite, photos, Plumbing, project

 

Tags:

Bernal Heights: Structural Upgrade


In order to remove a wall on our Bernal Height’s project, we needed to install a structural beam. Here are some photos of the install.

 
Leave a comment

Posted by on August 4, 2011 in jobsite, photos, project

 

Tags: , , , ,